The PRINCE2 method assumes that projects will be run according to a Corporate Quality Management System and, therefore, fits neatly with ISO9001:2008, if your organisation has a certificate.
Projects take place in dynamic environments and change requests are inevitable. All potential changes are dealt with as Project Issues and each one needs to be examined for:
A project needs a systematic approach to controlling how those changes affect versions of each product (configuration management). Configuration management applies to nearly all products and is often really hard work. The Configuration Management discipline consists of:
The 7 PRINCE2 Themes - Multiple-choice questionsTo conclude this section, please have a go at answering the following Foundation Examination multiple-choice questions about PRINCE2 Themes. Note your answers to the following questions and then select the link to the answer page. In the Project Management Team, which role undertakes the monitoring of all aspects of the project's performance and products?
Which one of the following is an optional Plan in PRINCE2?
Which type of control is used by the Project Board to check on progress during a Stage?
What is the minimum number of Stages in a PRINCE2 project?
Which of the following is not a response to a threat risk?
How well did you do? Here are the answers. Asnwers to the Themes multiple-choice questionsIn the Project Management Team, which role undertakes the monitoring of all aspects of the project's performance and products?
2. is correct. Project Assurance monitors aspects of the project's performance and products independently of the Project Manager. Which one of the following is an optional Plan in PRINCE2?
1. is correct. The Project Manager will always produce a Project Plan and at least two Stage Plans. They can choose whether or not they require Team Managers to produce Team Plans covering the work of the Team Manager's team. Which type of control is used by the Project Board to check on progress during a Stage?
1. is correct. The Project Board receives at a pre-determined frequency Highlight Reports from the Project Manager about their progress. What is the minimum number of Stages in a PRINCE2 project?
1. is correct. As already suggested above, there are always at least two Stages - the Initiation Stage (when the detailed planning is done) and the rest of the project. Which of the following is not a response to a risk threat?
3. is correct. We never deny threats could occur - we always consider the threats and oportunities facing a project. Move on now to the next section for an overview of The 7 PRINCE2 Processes.
|
PRINCE2® is a Registered Trade Mark of the Cabinet Office.
MSP® is a Registered Trade Mark of the Cabinet Office.
MoP™ is a Trade Mark of the Cabinet Office.
M_o_R® is a Registered Trade Mark of the Cabinet Office.
P3O® is a Registered Trade Mark of the Cabinet Office.
ITIL® and IT Infrastructure Library® are a Registered Trade Mark of the Cabinet Office.
The Swirl logo™ is a Trade Mark of the Cabinet Office.